- Hacker News
- What a waste of money, manpower and space.
- Hell yes!by exabrial
- In other news, SMRs appear to be fading away in Canada.
RIP SMRs: Is It the End of the Line for Small Modular Nuclear Reactors? [in Canada]
https://www.theenergymix.com/rip-smrs-is-it-the-end-of-the-l...
by pfdietz - Place your bets now.
Time until first power generated, and actual final total cost.
I’ll go 15 years and $10 Billion.
by testing22321 - A nuclear power plant is essentially a coal power plant with free fuel. Today, if you literally built a coal power plant with free fuel it would not be cheaper than solar. My question: If you built a small modular coal power plant, would that be cheaper than solar? It necessarily has to be cheaper than nuclear.
- The BWRX-300 footprint is so large they might as well just build large nuclear power units again and get 3-4x the powerby preisschild
- First, the Wiki page[1] for this reactor design has so little technical information. Frankly, it is a disappointing. For example, no where on the page does it explain that "300" means 300MW nameplate capacity. I had to Google for that info.
The canary in the coal mine is already happening in Canada.
From Wiki: https://en.wikipedia.org/wiki/BWRX-300#Canada
Yikes. Estimated cost of 15.2B USD for 1200MW of capacity. I am taking bets: How much will this project overrun its estimates? My guess: 25-50%. I don't get it. Why are these better than just building one big reactor with 1000MW+ of capacity?> On December 1, 2021, Ontario Power Generation (OPG) selected the BWRX-300 SMR for use at the Darlington Nuclear Generating Station. The final investment decision in May 2025 to proceed with the build of a BWRX-300 was based on a forecast cost of Canadian $7.7 billion (US$5.6 billion), with an estimated cost of Canadian $13.2 billion (US$9.6 billion) for the three further units on the same site.Also, it looks like Darlington Nuclear Generating Station originally planned to build 4x 1200MV Advanced CANDU reactors. These were cancelled and replaced with a plan to build 4x BWRX-300 reactors.
- This is a 10th Generation Boiling Water Reactor. Here's some relevant links:
https://en.wikipedia.org/wiki/BWRX-300
https://www.gevernova.com/nuclear/carbon-free-power/bwrx-300...
Interesting point: no pumps; convection flow for 100% of the operational envelope.
by CobaltFire